Balu Chaung (3) Hydropower Project

Project Manager & EPC Contractor

  •  Location-25 km east o Loikaw 5km east of Balu Chaung Power Station (2), near the confluence of Balu Chaung and Pawn Chaung
  •  Type Of Project- Hydropower Project (Run of the River Type)
  • Catchment Area -8090 Sq m
  • Average Annual Rainfall – 1090 mm
  • Regulated Discharge -51 Cu/m/sec
  • Type Of Weir – Reinforced Concrete,Tyrolean Type.