Upper Paung Laung Hydropower Project

OVERVIEW

(HTCT is one of the supplier of RCC & CVC)

  • Location – 43 km East Of Pyinmana Town, Naypyitaw District, Mandalay Division
  • Dam Type – Roller Compacted Concrete (RCC Dam)
  • Dam Height – 100 m.
  • Type Of Power House – Reinforced Concrete, 8 m x 40 m x 37 m
  • Type Of Turbine – Francis Vertical Shaft
  • RCC Concrete Volume – 1.1 million m3
  • Install Capacity – 140 MW (2 x 70 MW)
  • Annual Generated Energy – 454 GWh


HIGH SPEED CONVEYER

Max. Productivity 500m3/hr
Belt Speed,Width CO 2m/s;1.2m
C1 4m/s;1.0m
C2 3.87m/s;1.0m
Cw 2.45m/s;1.4m
Max.Conveying Distance 580m
Concrete Transferring Times 5
General Power 1200KW
Main Power Supply AC 380V,50HZ
Hydraulic Climb System 25cm/min
Max.System Pressure 28Mpa
RCC & CVC Batching Plants (4 Units)

  • Established in – 2009
  • Capacity – 500 m3/hr (125 m3/hr x 4Nos)
  • Type Of Batching Plant – (0 slump) Roller Compacted Concrete, Conventional Vibrated Concrete
  • Batching System – Litronic MPS II Liebherr Microprocessor Automatic Control
  • Control – Fully Computerized Auto Batching Control

Aggregate Crushing Plants (2 Units)

  • Established in – 2009
  • Capacity – 150 tons/ hr & 180 tons/ hr
  • Type Of Crushing Plant- Jaw/ Cone/ VST Nordberg. Metst Minerals