Yeywa Hydropower Project

OVERVIEW

(HTCT is one of the supplier of providing RCC & CVC)

  • Located On – Myitnge River, 52 km southeast of Mandalay City, at Yeywa Village in Kyaukse Township, Mandalay Division in central Myanmar.
  • Dam type – Roller Compacted Concrete (RCC Dam)
  • Dam height – 132 m
  • Dam Crest elevation – 197 m
  • RCC concrete volume-2.43 million m3
  • CVC Concrete Volume – 1 million m3
  • Installed Capacity – 790 MW
  • Annual Average Energy – 3550 GWH


RCC Batching Plants (4 Units)

  • Established in – 2002
  • Capacity – 500 m3 /hr (125 m3 /hr x 4 Nos.)
  • Type Of Batching Plant- (0 slump) Roller Compacted Concrete
  • Batching System – Litronic MPS II Liebherr Microprocessor Automatic Control
  • Control – Fully Computerized Auto Batching Control

CVC Batching Plants (2 Units)

  • Established in – 2002
  • Capacity – 120 m3/ hr (60 m3 /hr x 2 Nos.)
  • Type of Batching Plant – Conventional Vibrated Concrete
  • Batching System Plant – Fully Computerized Auto Batching Control

Aggregate Crushing Plants (2 Units)

  • Established in – 2002
  • Capacity – 100 tons/ hr & 150 tons/ hr
  • Type of Crushing Plant – Jaw/Cone/VSI Nordberg. Metso Minerals
  • Control – Manual